MetaStation/Solars

From tgwiki2
Revision as of 01:26, 9 July 2024 by imported>Senefi (Created page with "== Metastation Solar Arrays == There are a total of 141 solar panels already outside the station ready to be wired to the network. On top of this, the station has allocated...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Metastation Solar Arrays

There are a total of 141 solar panels already outside the station ready to be wired to the network. On top of this, the station has allocated space for a total of 215 panels. Additional solar panels can be retrieved from the engineering wing on the east end of the station.

Fore Port Array

Accessed via the north hallway of Fore Port Maintenance. The maintenance entrance is north of the Cargo Lobby. Go north from the Bounty Pad and then west of the Vault entrance. Once inside go north, slightly to the left, and then further north to the control room entrance.

The array itself is in a damaged state, and will need significant work to repair.

Suggested Equipment
Name Use Procurement
MODSuit / EVA Hardsuit + Helmet Allows the user to spend a prolonged period of time in space. Solar maintenance can take some time so proper equipment is suggested. Engineering EVA storage / EVA suit storage
Cable Coils To replace broken wiring between the solar panels and the control array Space near the array, Tool Storage