An APC (Area Power Controller) is the main method of control over the Cyberiad's Power Network. They take power from the multitude of cables located around the station, and distribute it to equipment, lighting, doors and pretty much anything that requires electrical power.
The '''[[Guide to Construction#APC|APC]]''' (Area Power Controller) oversees power distribution in the [[Nanotrasen#Epsilon Eridani Holdings|Station]]'s Power Network.<br>Each room and significant area (e.g., Medbay, Primary Hallways) has an APC, which can control power supply as long as it is connected to the main Power Network.
 
There is an APC located in each individual room on the station, in addition to larger, open areas (such as Medbay or the Primary Hallways). Where exactly the APC is in the room does not matter; so long as it is withing the confines of the room, and connected to the main Power Network, it will allow you to control the room's power supply.


=Operating the APC=
=Operating the APC=


By default, all APCs begin with their Cover Lock Engaged (see below). Only the AI may directly interact with them. However, anyone with Engineering access can simply click on an APC with their ID, unlocking it for use and granting them access to all the APC's functions.
Default APCs are locked and can only be accessed directly by the AI or anyone with Engineering access.<br>'''Remember to lock the APC after usage to prevent unauthorized tampering.'''
 
'''Attention:''' Unlocking an APC means ''anyone'' can use it. Remember to lock it back when you're done.


=The APC=
=The APC=
Line 17: Line 13:
It will be found along the walls, and simply looking at it can provide a wealth of information. For example:
It will be found along the walls, and simply looking at it can provide a wealth of information. For example:


==Screen Color==
==Screen Colour==


'''Green:''' APC is fully charged and everything is well.
*'''<span style="color: #1b9638">Green:</span>''' APC is fully charged and everything is well.


'''Light Blue:''' APC is charging to maximum capacity.
*'''<span style="color: #7199e3">Light Blue:</span>''' APC is charging to maximum capacity.


'''Red:''' APC is not charging and is, in fact, running out of power. May indicate problems with the Power Network. Check if the provided power matches the station's needs. Remember, once the APC dips below 50% power, all equipment is automatically shut down, and must be manually turned on. If the power dips low enough, doors will stop functioning and the lighting will shut off as well.
*'''<span style="color: #dd3333">Red:</span>''' Not charging and depleting. Check the Power Network. Check if the provided power matches the station's needs. If charge is below 50%: all equipment automatically shuts down. If the power continues decreasing, doors will stop functioning and the lighting will shut off as well.


'''Dark Blue:''' APC is hacked. This can either be the result of a Cryptographic Sequencer, or a Malfunctioning AI. The only way to repair a hacked APC is to deconstruct it entirely and replace it.
*'''<span style="color: #1239c2">Dark Blue:</span>''' Hacked. Cryptographic Sequencer, or a Malfunctioning AI. Deconstruct and replace destroyed electronics


==Light Indicators==
==Light Indicators==
Line 31: Line 27:
There are several, tiny lights on the APC that will light up and turn off depending on what the situation is:
There are several, tiny lights on the APC that will light up and turn off depending on what the situation is:


'''Top-Right Corner:''' A red light means the APC cover is locked, and it cannot be crowbarred open. A green light means the cover is unlocked, and the APC can be freely tinkered with.
'''Top-Right:''' APC cover status (red=locked, green=unlocked).
 
'''Bottom-Left Corner:''' A red light means the room's equipment is turned off. This can be intentional, or a result of a power failure.


'''Bottom-Center:''' A red light means the room's lighting is turned off. This can be intentional, or a result of a power failure.
'''Bottom-Left:''' Room's equipment status (red=off).


'''Bottom-Right:''' A red light means the room's environmental equipment (like doors) are powered down. This can be intentional, or a result of a power failure.
'''Bottom-Center:''' Room's lighting status (red=off).


'''Bottom-Right:''' Room's environmental equipment status (red=off).


=User Interface=
=User Interface=


Below is a sample UI of an APC:
[[File:APC_Interface.png]]
 
[[File:APC UI.png]]


It may look daunting, but using this UI is actually quite simple.
{{TGUI-Text|Content=Main Breaker}}Main switch for powering the room.


'''Main Breaker:''' Essentially, the main switch. Turn it off, and everything powers down and cannot be turned on without also turning on the main breaker. Simplest way to disable power to a room.
{{TGUI-Text|Content=External Power}}Indicates if the APC is receiving power from the power grid.


'''External Power:''' This will tell you if the APC is actually receiving power or not. Assuming it is correctly wired to the main Power Network, and a proper power source is set up, this should not be a problem. If it is, something went wrong. Fix it.
{{TGUI-Text|Content=Power Cell Charge}}Power cell's charge status. You can replace cells with improved ones (e.g. from Science).


'''Power Cell Charge:''' Straightforward. How much juice is in the cell. Keep in mind, you can replace the default cells (High-Capacity) with improved ones from Science.
{{TGUI-Text|Content=Charge Mode}}APC's charging status. {{TGUI-Button|Content=Auto|button_color=green}}Automatically siphoning from power grid.


'''Charge Mode:''' Whether or not the APC actually charges. If it is set to Auto, it will automatically attempt to siphon power from the Power Network to charge itself. Unless you want to actively sabotage the station, do not set this to Off.
{{TGUI-Subtitle|Title=Power Channels}}Shows power usage of equipment, lighting, and environmental equipment. Handy if you want to pick which systems you want on.


'''Power Channels:''' The main function of the APC. These channels let you see how much power the room is taking from the main Power Network, which is a simple sum of all the equipment, lighting and environmental equipment, with a nifty total sum at the bottom. Setting the option to Auto will keep everything online if power is above 50%, and will slowly start shutting off systems one by one if it dips low enough. Setting it to On will keep the corresponding equipment online at all times, siphoning power, while Off allows you to pick which piece of equipment you shut down. Very handy.
{{TGUI-Text|Content=Cover Lock}}Locks the APC to prevent tampering.
 
'''Cover Lock:''' Whether or not you can interact with the APC in person. Remember to lock this after you're done, so no one can fiddle with the settings, or sabotage it.


=Construction and Maintenance=
=Construction and Maintenance=
For an APC to be affected, for better or for worse, by the station's power grid, it needs a cable knot on the tile of its "terminal", which you can find by crowbarring the tile directly below the APC. You may wish to sever the connection in event of a hotwired engine, or a power sink; Just keep in mind that you'll need insulated gloves to do this safely.
APC requires a cable knot connected to the power grid for operation. You can find it by opening the tile below the APC with a crowbar.


<div class="toccolours mw-collapsible mw-collapsed" style="width:99%">
<div class="toccolours mw-collapsible mw-collapsed" style="width:99%">
'''To deconstruct a broken APC:'''
'''Deconstruction:'''
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">


* Use a crowbar to remove the damaged panel, and expose the power cell.
#'''Crowbar''' to expose the power cell.
* Remove the power cell if present, then screwdrive the APC to loosen any wires.
#Remove the power cell if present with your '''Hands'''.
* Use a wirecutter to disconnect the terminal from the APC - the floor tile beneath the APC must be exposed, first.
#'''Screwdrive''' to loosen wires.
* Use a crowbar to get rid of the busted electronics.
#'''Wirecutter''' to disconnect the terminal (floor tile below must be exposed).
* Finally, at this point, you can either eliminate the frame in its entirety with a welder, or you can replace the busted casing with a new APC frame. If there are no more APCs in an area, you can construct another by using an APC frame on a wall
#'''Crowbar''' to remove damaged electronics.
#'''Welder''' to remove frame or replace with new APC Frame.
#If there are no more APCs in an area, you can construct another by using an APC frame on a wall.
</div></div>
</div></div>
<div class="toccolours mw-collapsible mw-collapsed" style="width:99%">
<div class="toccolours mw-collapsible mw-collapsed" style="width:99%">
'''To construct a new APC:'''
'''Construction:'''
<div class="mw-collapsible-content">
<div class="mw-collapsible-content">
Note that this will only work if the area lacks an APC!
Note that this will only work if the area lacks an APC!


* Use an APC frame on a wall to create a new APC mount.
#Mount APC Frame on a wall.
* Install the APC electronics into the APC mount.
#Install APC electronics.
* Remove the floor tiles beneath your APC frame, then use 5 cable to install a power terminal.
#Remove the floor tile below APC, use 5 cables to install power terminal.
* Screw the board in place, now that the terminal is present.
#Screw the board in place.
* Add a cell, and your APC is ready for business!
#Add a power cell.


Note that you will need to wire a cable knot from the APC terminal, to a viable power grid; Upon doing so, your system should be stable and powered.
Connect the APC terminal to a viable power grid for a stable and powered system.
</div></div>
</div></div>
[[Category:Objects‏‎]]

Latest revision as of 15:42, 2 June 2024

The APC (Area Power Controller) oversees power distribution in the Station's Power Network.
Each room and significant area (e.g., Medbay, Primary Hallways) has an APC, which can control power supply as long as it is connected to the main Power Network.

Operating the APC

Default APCs are locked and can only be accessed directly by the AI or anyone with Engineering access.
Remember to lock the APC after usage to prevent unauthorized tampering.

The APC

This is what an APC will look like, in-game:

APC.png

It will be found along the walls, and simply looking at it can provide a wealth of information. For example:

Screen Colour

  • Green: APC is fully charged and everything is well.
  • Light Blue: APC is charging to maximum capacity.
  • Red: Not charging and depleting. Check the Power Network. Check if the provided power matches the station's needs. If charge is below 50%: all equipment automatically shuts down. If the power continues decreasing, doors will stop functioning and the lighting will shut off as well.
  • Dark Blue: Hacked. Cryptographic Sequencer, or a Malfunctioning AI. Deconstruct and replace destroyed electronics

Light Indicators

There are several, tiny lights on the APC that will light up and turn off depending on what the situation is:

Top-Right: APC cover status (red=locked, green=unlocked).

Bottom-Left: Room's equipment status (red=off).

Bottom-Center: Room's lighting status (red=off).

Bottom-Right: Room's environmental equipment status (red=off).

User Interface

APC Interface.png

Main Breaker Main switch for powering the room.

External Power Indicates if the APC is receiving power from the power grid.

Power Cell Charge Power cell's charge status. You can replace cells with improved ones (e.g. from Science).

Charge Mode APC's charging status. Auto Automatically siphoning from power grid.

Power Channels Shows power usage of equipment, lighting, and environmental equipment. Handy if you want to pick which systems you want on.

Cover Lock Locks the APC to prevent tampering.

Construction and Maintenance

APC requires a cable knot connected to the power grid for operation. You can find it by opening the tile below the APC with a crowbar.

Deconstruction:

  1. Crowbar to expose the power cell.
  2. Remove the power cell if present with your Hands.
  3. Screwdrive to loosen wires.
  4. Wirecutter to disconnect the terminal (floor tile below must be exposed).
  5. Crowbar to remove damaged electronics.
  6. Welder to remove frame or replace with new APC Frame.
  7. If there are no more APCs in an area, you can construct another by using an APC frame on a wall.

Construction:

Note that this will only work if the area lacks an APC!

  1. Mount APC Frame on a wall.
  2. Install APC electronics.
  3. Remove the floor tile below APC, use 5 cables to install power terminal.
  4. Screw the board in place.
  5. Add a power cell.

Connect the APC terminal to a viable power grid for a stable and powered system.